Level 2 NVQ in Sub-structure Work Occupations - Underpinning Operations (Excavated Underpinning)
This NVQ is eligible for a CITB qualification grant.
The qualification structure below specifies the combination of units that need to be achieved for the individual to be awarded the qualification, for those working as a specialist in excavated underpinning operations within the construction industry.
Blue CSCS Card
On completion of your NVQ qualification, along with passing the relevant CITB HS&E test (within the last 2 years), you will be able to apply for the blue CSCS skilled worker card.
L2 NVQ Diploma in Sub-structure Work Occupations (Construction) - Underpinning Operations (Excavated Underpinning)
Minimum Credit Value: 81
To achieve this qualification a minimum of 81 credits needs to be attained. This comprises the 4 mandatory units plus a minimum of 14 credits from ONE unit must come from Optional Group A with a further 44 credits from FOUR units which must come from Optional Group B.
Mandatory Units - The learner must achieve 23 credits from the 4 units in this Mandatory Group.
Optional Group A - The learner must achieve a minimum of 14 credits from at least 1 unit in this Optional Group.
Optional Group B - The learner must achieve a minimum of 44 credits from at least 4 units in this Optional Group.
Mandatory Units
Credit Value: 23 | Units Required: 4
Title | Credits | Level | |
---|---|---|---|
Unit Description Setting out and marking positions for underpinning sequence in the workplace |
Credits: 13 | Level: 3 | More info about this unit |
Unit Description Moving, Handling and Storing Resources in the Workplace |
Credits: 5 | Level: 2 | More info about this unit |
Unit Description Conforming to Productive Working Practices in the Workplace |
Credits: 3 | Level: 2 | More info about this unit |
Unit Description Conforming to General Health, Safety and Welfare in the Workplace |
Credits: 2 | Level: 1 | More info about this unit |
Optional Units
Credit Value: 58 | Units Required: 5
Title | Credits | Level | More info |
---|---|---|---|
Group A - Excavating for underpinning in the workplace | 14 | 2 | More info |
Group A - Excavating and providing temporary support to pits and trenches in the workplace | 17 | 2 | More info |
Group B - Erecting and striking underpinning formwork in the workplace | 9 | 2 | More info |
Group B - Installing reinforcement steel for underpinning in the workplace | 17 | 2 | More info |
Group B - Installing dry packing in the workplace | 9 | 2 | More info |
Group B - Repairing sub-structure after underpinning in the workplace | 15 | 2 | More info |
Group B - Placing and compacting concrete in the workplace | 11 | 2 | More info |
Group B - Installing, constructing, maintaining, dismantling and removing temporary works in the workplace | 22 | 2 | More info |