Level 3 NVQ in Wall and Floor Tiling
This NVQ is eligible for a CITB qualification grant.
The NVQ Level 3 in Wall and Floor Tiling Qualification structure below specifies the combination of units that need to be achieved for the individual to be awarded the qualification to work as a competent tiler.
CSCS Gold Card
On completion of your NVQ qualification, along with passing the relevant CITB HS&E test you will be able to apply for the CSCS Advanced Craft Gold Card.
L3 NVQ Diploma in Wall and Floor Tiling (Construction)
Minimum Credit Value: 96
Reference: 603/5463/X
To achieve this qualification a minimum of 9 units needs to be attained. This comprises of 7 units from the Mandatory Group and 2 units from the Optional Group.
Mandatory Units
Credit Value: 76 | Units Required: 7
Title | Credits | Level | |
---|---|---|---|
Unit Description Confirming the Occupational Method of Work in the Workplace |
Credits: 11 | Level: 3 | More info about this unit |
Unit Description Confirming Work Activities and Resources for an Occupational Work Area in the Workplace |
Credits: 10 | Level: 3 | More info about this unit |
Unit Description Conforming to General Health, Safety and Welfare in the Workplace |
Credits: 2 | Level: 1 | More info about this unit |
Unit Description Developing and Maintaining Good Occupational Working Relationships in the Workplace |
Credits: 8 | Level: 3 | More info about this unit |
Unit Description Preparing backgrounds for tiling in the workplace |
Credits: 13 | Level: 2 | More info about this unit |
Unit Description Producing complex ceramic, mosaic and stone surface finishes in the workplace |
Credits: 17 | Level: 3 | More info about this unit |
Unit Description Tiling wall and floor surfaces in the workplace |
Credits: 15 | Level: 2 | More info about this unit |
Optional Units
Credit Value: 20 | Units Required: 2
Title | Credits | Level | More info |
---|---|---|---|
Laying sand and cement screeds in the workplace | 10 | 2 | More info |
Laying under tile heating systems and tiling surfaces in the workplace | 18 | 2 | More info |
Producing internal and external sand and cement backgrounds in the workplace | 14 | 3 | More info |
Providing drainage for tiled surfaces in the workplace | 10 | 3 | More info |